Less than 2 yuan, 60 TPD integrated MBR project of Mount Huangshan Hospital

Project Introduction

 

1.Basic project information

Project Name     Mount Huangshan Hospital 60TPD integrated MBR sewage treatment equipment
Project Type Wastewater treatment
Project Location Bengbu City
Project Launch July 2021
Project Delivery October 2021
Project Status Delivered and running stably

2.Project Background and Requirements

With the continuous development of medical services and increasingly strict environmental protection requirements, the original sewage treatment facilities of Bengbu Mount Huangshan Hospital can no longer meet the current and future operational needs. As an institution providing continuous medical services, hospitals face unique challenges in sewage treatment:
Strict discharge standards: Hospital wastewater is complex in composition, containing pathogens, drug residues, etc., and must undergo deep treatment to meet discharge or reuse standards, avoiding secondary pollution to the environment.
Space limitations: As a renovation project, efficient processing equipment needs to be installed within a limited existing space, which places high demands on the integration and footprint of the equipment.
Operational stability: The hospital operates 24 hours a day without interruption, and the sewage treatment system must be stable, reliable, and easy to maintain, without affecting the normal order of the hospital.
Cost control requirements: While ensuring treatment effectiveness, hospitals also hope to effectively reduce long-term operational energy consumption and costs.
To solve the above problems, we have customized an integrated MBR (membrane bioreactor) sewage treatment equipment with a processing capacity of 60 tons/day (60TPD).
MBR process is a new water treatment technology that combines membrane separation technology with biological treatment technology. It replaces the traditional secondary sedimentation tank with membrane components, which can efficiently perform solid-liquid separation and obtain stable effluent that can be directly reused.
Core configuration and technical highlights:
Equipment model: MBR-535-15 equipment is used, designed specifically for medium water volume and high standard effluent requirements.
Core membrane components: Equipped with 10 high-performance MBR membranes internally. This membrane has the characteristics of small pore size, high flux, and strong anti pollution ability, which can effectively intercept bacteria, viruses, and large organic molecules in water, ensuring clear and sterile effluent water quality.
Highly integrated: the whole system is integrated in a compact equipment box, occupying a small area, which is very suitable for reconstruction projects such as Mount Huangshan Hospital, greatly saving civil construction costs and space.
Automated operation: The equipment is equipped with a fully automatic control system, which can achieve unmanned operation and automatically complete the entire process of water inlet, treatment, outlet, backwashing, etc., greatly reducing manual management costs.

3.Project effectiveness and economic benefits

         Sample Name

Testing Items

Raw water (regulating tank)

Water production (sampling valve)

Water production (discharge outlet)

Appearance

Grey turbidity

colorless and transparent

colorless and transparent

pH(dimensionless)

7.3

7.2

7.2

COD(mg/L)

335.2

48.6

57.5

ammonia nitrogen(mg/L)

42.8

5.6

4.8

Total Phosphorus(mg/L)

2.2

0.3

0.2

The operating cost is economical, and the investment return is considerable
Thanks to the high efficiency of MBR process and optimized equipment design, the operating cost of the system is effectively controlled at a low level of 1.8-2 yuan/ton. This includes electricity, medication, and maintenance and replacement costs for membrane components, saving the hospital a significant amount of long-term expenses.
Significant environmental and social benefits
The successful implementation of the project not only solved the hospital's pollution problem and eliminated potential pollution hazards, but also practiced the environmental protection concept of a green hospital through the reuse of reclaimed water, enhanced the hospital's social image, and created a cleaner and more beautiful environment for medical staff and patients.

Image display

MBR-535-15 membrane element

Device electrical control room

Container equipment assembly

Final acceptance effect

Case Feedback

Please provide the following valid information, and we will contact you as soon as possible

Other Cases
Low cost and efficient Bengbu 200TPD high ammonia nitrogen wastewater PTFE deamination project
Ultra high concentration ammonia nitrogen wastewater treatment project, a stable economic and technological solution to replace traditional physical and chemical methods
More
0.4-0.5 yuan/ton, Sichuan 400m ³/d ceramic flat membrane ultrafiltration integrated equipment project
The ceramic flat membrane project is a model of high difficulty and high wave water quality treatment, which can achieve significant economic benefits at extremely low operating costs.
More
A secondary seawater desalination system priced at 5.165 yuan/ton? The minimum cost can be controlled at 3 yuan
Zhoushan, Zhejiang, China produces 250 tons of seawater desalination system per day, with ultra-low operating costs and stable long-term performance.
More
120TPD Landfill Renovation Plan - Controlling Pollution and Costs
Customized solutions to address the issue of leachate in landfills, effectively controlling surrounding pollution and cost consumption.
More
Less than 2 yuan, 60 TPD integrated MBR project of Mount Huangshan Hospital
In view of the sewage treatment needs of Bengbu Mount Huangshan Hospital, we have designed a cost-effective integrated MBR treatment device
More
2 yuan/ton cost - Qatar factory integrated MBR equipment water reuse project
Qatar field project, stable operation and super cost-effectiveness
More
Extreme environment: Russia 1440m3/d water supply project, cost 3.5-4 yuan
This project is tailored to the extreme geographical environment of Russia, with customized design and installation of water filtration projects, and has extremely high economic value.
More
Malaysia 200TPD seawater desalination container project
A container seawater desalination system that can be delivered quickly, with stable operation and cost-effectiveness
More
200m ³/d to alleviate the freshwater crisis on islands, less than 4 yuan per ton of freshwater
Customized fresh water system of scenic island can effectively solve the problem of drinking difficulty and high cost for the public
More
Reclaimed water with a capacity of 1000TPD per day costs only about 2.5 yuan
The Anqing reclaimed water reuse project adopts a two-stage filtration process, achieving 1000TPD/day at a cost of only about 2.5 yuan
More
leo@coopmem.com
+86 15556910898
For More Cooperate Information